Project

PSI Validation Instills Confidence

PROJECT

PSI Validation of Refinery Relief System

LOCATION

Marathon Petroleum Company Catlettsburg, KY

Background

The client, one of the country’s largest crude oil refineries, called on ENTRUST Solutions Group to validate the PSI components of their relief system, including development of process diagrams, isometric drawings, design specification sheets, and associated equipment file items.

Challenges

The project presented a number of interesting challenges. First, the overall size and scale of the project was enormous, covering every unit in the refinery. In addition, the team had to deal with the demolition of equipment in several units, which impacted the relief paths.

Solutions

The project required field verification of all process diagrams and isometric drawings representing the flare, atmospheric, and process/thermal components of the client’s relief system. ENTRUST developed a tracking system to ensure that all required information was gathered during the field verification and reviewed it against the information found in the multiple refinery information storage systems for master PSI and equipment documentation.

All of the required revisions were tracked across the multiple refinery information storage systems, and the systems were audited to confirm the proper documentation had been linked and correctly illustrated the project revisions. The PSI validation and equipment documentation assured the client that the relief system PSI and equipment documentation were correct and the information can be used with confidence in the future.

The PSI validation assured the client that the relief system PSI and equipment documentation were correct and the information can be used with confidence in the future.”

Please Sign Up to get Our Latest Newsletter